Latest ERCOT hub and load-zone prices (public).
GET/v1/power/ercot/prices
For each of ERCOT's 15 hub and load-zone settlement points: the latest 5-minute SCED LMP, the latest 15-minute real-time settlement point price (the RT perps' settlement basis), and the RT perpetual listed on the point. Reference data collected from ERCOT's public display reports — not an index input. A price is null until first observed and stale when flagged invalid upstream or older than 20 min (LMP) / 40 min (SPP). Values are µUSDC per MWh and may be negative.
Cached 10 s. Rate limit: 120 requests / minute per client IP.
No authentication is required for this endpoint.
Responses
- 200
- 429
- 503
Latest prices for all 15 points.
Too many attempts inside the fixed rate-limit window (10 attempts / 5 minutes per key). Retry in a few minutes.
A required downstream (matching engine, ClickHouse, custody, instrument service) is unreachable. The request was not processed; retry with backoff.